Parc Clematis Project Details

Project DetailsPARC CLEMATIS (錦泰門第)
Location2-20 Jalan Lempeng
District05
DeveloperSING-HAIYI GOLD PTE LTD
Developer’s License No.C1330
Site Area58,867.00m2
Company Registration No.:201732272R
Project Account No.451-308-964-8 UNITED OVERSEAS BANK LTD
ArchitectP&T Consultants Pte Ltd, Architect
M&E EngineerRankine and Hill Pte Ltd
C&S EngineerP&T Consultants Pte Ltd, Structural
Quantity SurveyorRider Levett Bucknall
Landscape ConsultantTinderBox Pte Ltd
SolicitorWNLEX LLC
No. of Storeys24
No. of Blocks9
Payment SchemeNormal Progressive Payment Scheme
Mukim Lot No.04512W MK 05 at Jalan Lempeng
Site UseResidential Flat Developement
Tenure99 Leasehold
Total No. of Units1450 Apartment Units, 8 Strata Terraces, 4 Strata Corner Terraces, 6 Strata Bangalows
No. of Car Park Lots1468 + 9 Handicap Lots
No. of Lifts32 including Private lift and Clubhouse lift
Bicycle Lots245
Expected Date of TOP1 September 2023
Expected Date of Legal Completion1 September 2026
Security24 Hours Security Guard

(Project details for Parc Clematis may be subjected to change without prior notice)

Parc Clematis Project Summary

  • The proposed development site is located at Clementi Planning area. It is situated at existing Park West Apartment along Jalan Lempeng, junction of AYE and Clementi Avenue 6 and opposite Faber landed house area.
  • The new development will consist of nine 24-storey tower blocks residential apartment development, 6 units of 2 storey strata bungalow and 12 units of 2 storey strata semi-detached (total 1468 units).
  • The 2 storey strata landed houses are located along Jalan Lempeng opposite of Faber landed house area and along the boundary next to Regent Park to create a building edge fronting landed area and low rise of 2 storey Apartment. It will consist of premium 5 bedroom units with wide frontage balconies.
  • The tower blocks are tilted within north-south orientation and avoid having apartment windows facing directly to AYE for the blocks along the AYE. The tower blocks are placed distance away between blocks to give better privacy for the apartment units and avoid having wall-like effect.
  • The tower blocks will be elevated up from the 1st storey landscape level, to allow 2nd storey residential block to look over the low rise cluster towards landed house area.
  • By elevating the tower footprint up and placed each blocks distance away, it allow more greeneries at the base of tower blocks and giving a see – through vantage views towards landscape greeneries. It is also allow more sunlight and airflow through the site and the neighbourhoods. The total height for the blocks are within the allowable aggregate height for 24 storey residential building.
  • The proposed development will provide 2 vehicular entrances which take from the existing development entrance where the main drop off will be taken from Jalan Lempeng opposite Faber landed house and the secondary entrance will be taken from Jalan Lempeng next to the Regent Park.
  • The proposed service entrance for bin centre and substation will be taken from existing service entrance at the end of Jalan Lempeng.
  • The proposed main side gate will be located next to the main ingress egress along Jalan Lempeng which allow enough width for the pedestrian path and cycling path.
  • The proposed secondary side gate will be located along the Clementi Avenue 6 which connect to the bus stop next to Regent Park.

Book An Appointment to view Parc Clematis ShowFlat & get VVIP Discounts (Limited Time), Direct Developer Price, & Hardcopy E-Brochure. Guaranteed with Best Price Possible.

OR

Fill up the form on the right and get a copy of Parc Clematis Price, E-Brochure, and Latest Updates!